Show Filters
Regulation 7 Materials and Workmanship

Appendix B: Standards referred to

Share

BS EN ISO 9000
Quality management systems. Fundamentals and vocabulary [2005]

BS EN ISO 9001
Quality management systems. Requirements
[2008]

BS 8000-1

Workmanship on building sites. Code of practice for excavation and filling [1989]

BS 8000-2-1

Workmanship on building sites. Code of practice for concrete work. Mixing and transporting concrete [1990 + AMD 9324].

BS 8000-2-2

Workmanship on building sites. Code of practice for concrete work. Sitework with in situ and precast concrete [1990]

BS 8000-3

Workmanship on building sites. Code of practice for masonry [2001]

BS 8000-4

Workmanship on building sites. Code of practice for waterproofing [1989]

BS 8000-5

Workmanship on building sites. Code of practice for carpentry, joinery and general fixings [1990]

BS 8000-6

Workmanship on building sites. Code of practice for slating and tiling of roofs and claddings [1990]

BS 8000-7

Workmanship on building sites. Code of practice for glazing [1990]

BS 8000-8

Workmanship on building sites. Code of practice for plasterboard partitions and dry linings [1994]

BS 8000-9
Workmanship on building sites. Cementitious levelling screeds and wearing screeds. Code of practice [2003]

BS 8000-11

Workmanship on building sites. Internal and external wall and floor tiling. Ceramic and agglomerated stone tiles, natural stone and terrazzo tiles and slabs, and mosaics. Code of practice [2011]

BS 8000-12
Workmanship on building sites. Code of practice for decorative wallcoverings and painting [1989]

BS 8000-13

Workmanship on building sites. Code of practice for above ground drainage and sanitary appliances [1989]

BS 8000-14

Workmanship on building sites. Code of practice for below ground drainage [1989]

BS 8000-15

Workmanship on building sites. Code of practice for hot and cold water services (domestic scale) [1990]

BS 8000-16

Workmanship on building sites. Code of practice for sealing joints in buildings using sealants [1997 + A1:2010]

External works External insulation Cavity wall insulation Wall ties Air to water heat pump Air to ground heat pump Insulated concrete formwork Suspended floor Time and temperature Drainage Ground conditions Plasterboard Tiling Tongue and groove Building energy rating Water pump Water tank External wall insulation External doors Internal doors Tiles Wall tiles Floor tiles Natural ventilation Water membrane Water vapour membrane